Equinor
Equinor Energy AS · Stavanger, Norway
About this company
Equinor is a field operator on the Norwegian shelf. The Brønnøysund Register Centre lists Equinor Energy AS with its business address in Stavanger, incorporated in 2007. The catalog lists 10 installations it operates: Aasta Hansteen, Åsgard A, Gullfaks A, Heidrun TLP, Johan Castberg FPSO, Johan Sverdrup field centre, Oseberg Field Centre, Snorre A, Statfjord A and Troll A.
- Category
- Field operator
- Legal name
- Equinor Energy AS
- Organisation number
- 990888213
- Business address
- Stavanger, Norway
- Incorporated
- 2007
- Website
- equinor.com
Company facts: Brønnøysund Register Centre entry ↗
Equinor runs installations on fields that have produced for more than 25 years. Life-extension applications need documented integrity, which Sørvind's studies supply.
Head office and installations
Installations (10)
- Aasta HansteenSpar platform · Aasta Hansteen field, production start 2018
- Åsgard AFPSO · Åsgard field, production start 1999
- Gullfaks AIntegrated platform on a concrete base · Gullfaks field, production start 1986
- Heidrun TLPFloating concrete tension-leg platform · Heidrun field, production start 1995
- Johan Castberg FPSOFPSO · Johan Castberg field, production start 2025
- Johan Sverdrup field centreBridge-linked steel platforms (field centre) · Johan Sverdrup field, production start 2019
- Oseberg Field CentreBridge-linked process and drilling platforms · Oseberg field, production start 1988
- Snorre AFloating tension-leg platform · Snorre field, production start 1992
- Statfjord AIntegrated concrete platform · Statfjord field, production start 1979
- Troll AFixed wellhead and compression platform, concrete substructure · Troll field, production start 1995
Recent signals mentioning Equinor
- Equinor plans the first scheduled integrity campaign on the Johan Castberg FPSOSampleMaintenance· Trade press (sample)· 03 Sept 2026
- Equinor plans modifications at the Oseberg Field CentreSampleInvestment· Trade press (sample)· 22 Aug 2026
- Equinor plans hull inspections on the Aasta Hansteen sparSampleMaintenance· Trade press (sample)· 01 Jul 2026
Key contacts
- Ida HauglandAsset Integrity Managerida.haugland@equinor.example ✓
- Ida NilsenCategory Manager, Integrity Servicesida.nilsen@equinor.example
- Line LieOperations Managerline.lie@equinor.example
- Line SolbergHead of Maintenance & Modificationsline.solberg@equinor.example ✓
People are fictional. Addresses use the reserved .example domain and cannot receive mail. ✓ marks an address the pipeline verified.
Sources (8)
- [1]Statfjord A late-life plan update adds concrete inspection scope (sample)signal
- [2]Equinor plans the first scheduled integrity campaign on the Johan Castberg FPSO (sample)signal
- [3]Gullfaks A planned shutdown to include expanded inspection scope (sample)signal
- [4]Equinor plans modifications at the Oseberg Field Centre (sample)signal
- [5]Public reference: Norsk Petroleum field facts: Johan Sverdrup ↗enrichment
- [6]Public reference: Norsk Petroleum field facts: Troll ↗enrichment
- [7]Public reference: Norsk Petroleum field facts: Snorre ↗enrichment
- [8]Public reference: Norsk Petroleum field facts: Gullfaks ↗enrichment