← Back to Non-MODU catalogApproximate field location. Approximate field location (no published coordinate in the sources used). More on Equinor →
Installation · Equinor
Johan Sverdrup field centre
Bridge-linked steel platforms (field centre) · Johan Sverdrup field · North Sea
About this installation
Johan Sverdrup field centre is operated by Equinor on the Johan Sverdrup field in the North Sea, in 115 m of water. Norsk Petroleum lists production start on the Johan Sverdrup field in 2019. Early in field life, the first scheduled integrity campaigns set the inspection baseline.
- Operator
- Equinor
- Type
- Bridge-linked steel platforms (field centre)
- Area
- North Sea
Field facts: Norsk Petroleum field facts: Johan Sverdrup ↗
Location
Why this fits Sørvind
Shutdown & turnaround inspection campaigns
Planned shutdowns concentrate inspection work into short windows. Sørvind's shutdown & turnaround inspection campaigns are sized to the operator's turnaround.
Recent signals mentioning Johan Sverdrup field centre, Johan Sverdrup or Equinor
- Equinor plans the first scheduled integrity campaign on the Johan Castberg FPSOSampleMaintenance· Trade press (sample)· 03 Sept 2026
- Equinor plans modifications at the Oseberg Field CentreSampleInvestment· Trade press (sample)· 22 Aug 2026
- Equinor plans hull inspections on the Aasta Hansteen sparSampleMaintenance· Trade press (sample)· 01 Jul 2026
Contacts at Equinor (4)
- Ida HauglandAsset Integrity Managerida.haugland@equinor.example ✓
- Ida NilsenCategory Manager, Integrity Servicesida.nilsen@equinor.example
- Line LieOperations Managerline.lie@equinor.example
- Line SolbergHead of Maintenance & Modificationsline.solberg@equinor.example ✓
People are fictional. Addresses use the reserved .example domain and cannot receive mail. ✓ marks an address the pipeline verified.
Sources (8)
- [1]Statfjord A late-life plan update adds concrete inspection scope (sample)signal
- [2]Equinor plans the first scheduled integrity campaign on the Johan Castberg FPSO (sample)signal
- [3]Gullfaks A planned shutdown to include expanded inspection scope (sample)signal
- [4]Equinor plans modifications at the Oseberg Field Centre (sample)signal
- [5]Public reference: Norsk Petroleum field facts: Johan Sverdrup ↗enrichment
- [6]Public reference: Norsk Petroleum field facts: Troll ↗enrichment
- [7]Public reference: Norsk Petroleum field facts: Snorre ↗enrichment
- [8]Public reference: Norsk Petroleum field facts: Gullfaks ↗enrichment