Skip to content
Market Intel System
Back to Non-MODU catalog
Installation · Equinor

Snorre A

Floating tension-leg platform · Snorre field · North Sea

About this installation

Snorre A is operated by Equinor on the Snorre field in the North Sea, in 300–350 m of water. Norsk Petroleum lists production start on the Snorre field in 1992. After 34 years of production the field is in late life, when documented integrity decides how long installations stay in service.

Operator
Equinor
Type
Floating tension-leg platform
Area
North Sea
Water depth
300–350 m
Public source ↗
Production start
1992
Public source ↗

Field facts: Norsk Petroleum field facts: Snorre

Location

Coordinates: Wikipedia article coordinates.
Why this fits Sørvind
Floater hull & mooring integrity

Floating installations carry their own hull and mooring inspection programmes. Sørvind's floater hull & mooring integrity service is built for them.

More on Equinor

Recent signals mentioning Snorre A, Snorre or Equinor

Contacts at Equinor (4)

People are fictional. Addresses use the reserved .example domain and cannot receive mail. ✓ marks an address the pipeline verified.

Sources (8)
  1. [1]Statfjord A late-life plan update adds concrete inspection scope (sample)signal
  2. [2]Equinor plans the first scheduled integrity campaign on the Johan Castberg FPSO (sample)signal
  3. [3]Gullfaks A planned shutdown to include expanded inspection scope (sample)signal
  4. [4]Equinor plans modifications at the Oseberg Field Centre (sample)signal
  5. [5]Public reference: Norsk Petroleum field facts: Johan Sverdrupenrichment
  6. [6]Public reference: Norsk Petroleum field facts: Trollenrichment
  7. [7]Public reference: Norsk Petroleum field facts: Snorreenrichment
  8. [8]Public reference: Norsk Petroleum field facts: Gullfaksenrichment