Skip to content
Market Intel System
Back to Non-MODU catalog
Installation · Equinor

Troll A

Fixed wellhead and compression platform, concrete substructure · Troll field · North Sea

About this installation

Troll A is operated by Equinor on the Troll field in the North Sea, in 300–330 m of water. Norsk Petroleum lists production start on the Troll field in 1995. After 31 years of production the field is in late life, when documented integrity decides how long installations stay in service.

Operator
Equinor
Type
Fixed wellhead and compression platform, concrete substructure
Area
North Sea
Water depth
300–330 m
Public source ↗
Production start
1995
Public source ↗

Field facts: Norsk Petroleum field facts: Troll

Location

Coordinates: Wikipedia article coordinates.
Why this fits Sørvind
Life-extension integrity studies

Late-life installations need integrity evidence to stay in service. Sørvind's life-extension integrity studies provide it for the operator's application.

More on Equinor

Recent signals mentioning Troll A, Troll or Equinor

Contacts at Equinor (4)

People are fictional. Addresses use the reserved .example domain and cannot receive mail. ✓ marks an address the pipeline verified.

Sources (8)
  1. [1]Statfjord A late-life plan update adds concrete inspection scope (sample)signal
  2. [2]Equinor plans the first scheduled integrity campaign on the Johan Castberg FPSO (sample)signal
  3. [3]Gullfaks A planned shutdown to include expanded inspection scope (sample)signal
  4. [4]Equinor plans modifications at the Oseberg Field Centre (sample)signal
  5. [5]Public reference: Norsk Petroleum field facts: Johan Sverdrupenrichment
  6. [6]Public reference: Norsk Petroleum field facts: Trollenrichment
  7. [7]Public reference: Norsk Petroleum field facts: Snorreenrichment
  8. [8]Public reference: Norsk Petroleum field facts: Gullfaksenrichment