Skip to content
Market Intel System
Back to Non-MODU catalog
Installation · Equinor

Heidrun TLP

Floating concrete tension-leg platform · Heidrun field · Norwegian Sea

About this installation

Heidrun TLP is operated by Equinor on the Heidrun field in the Norwegian Sea, in 350 m of water. Norsk Petroleum lists production start on the Heidrun field in 1995. After 31 years of production the field is in late life, when documented integrity decides how long installations stay in service.

Operator
Equinor
Type
Floating concrete tension-leg platform
Field
Heidrun
Public source ↗
Area
Norwegian Sea
Water depth
350 m
Public source ↗
Production start
1995
Public source ↗

Field facts: Norsk Petroleum field facts: Heidrun

Location

Coordinates: Wikipedia article coordinates.
Why this fits Sørvind
Floater hull & mooring integrity

Floating installations carry their own hull and mooring inspection programmes. Sørvind's floater hull & mooring integrity service is built for them.

More on Equinor

Recent signals mentioning Heidrun TLP, Heidrun or Equinor

Contacts at Equinor (4)

People are fictional. Addresses use the reserved .example domain and cannot receive mail. ✓ marks an address the pipeline verified.

Sources (8)
  1. [1]Statfjord A late-life plan update adds concrete inspection scope (sample)signal
  2. [2]Equinor plans the first scheduled integrity campaign on the Johan Castberg FPSO (sample)signal
  3. [3]Gullfaks A planned shutdown to include expanded inspection scope (sample)signal
  4. [4]Equinor plans modifications at the Oseberg Field Centre (sample)signal
  5. [5]Public reference: Norsk Petroleum field facts: Johan Sverdrupenrichment
  6. [6]Public reference: Norsk Petroleum field facts: Trollenrichment
  7. [7]Public reference: Norsk Petroleum field facts: Snorreenrichment
  8. [8]Public reference: Norsk Petroleum field facts: Gullfaksenrichment