← Back to Non-MODU catalogCoordinates: Wikipedia article coordinates. More on Equinor →
Installation · Equinor
Gullfaks A
Integrated platform on a concrete base · Gullfaks field · North Sea
IN THIS WEEK
About this installation
Gullfaks A is operated by Equinor on the Gullfaks field in the North Sea, in 130–220 m of water. Norsk Petroleum lists production start on the Gullfaks field in 1986. After 40 years of production the field is in late life, when documented integrity decides how long installations stay in service.
- Operator
- Equinor
- Type
- Integrated platform on a concrete base
- Area
- North Sea
Field facts: Norsk Petroleum field facts: Gullfaks ↗
Location
Why this fits Sørvind
Life-extension integrity studies
Late-life installations need integrity evidence to stay in service. Sørvind's life-extension integrity studies provide it for the operator's application.
Recent signals mentioning Gullfaks A, Gullfaks or Equinor
- Equinor plans the first scheduled integrity campaign on the Johan Castberg FPSOSampleMaintenance· Trade press (sample)· 03 Sept 2026
- Gullfaks A planned shutdown to include expanded inspection scopeSampleMaintenance· Company newsroom (sample)· 27 Aug 2026
- Equinor plans modifications at the Oseberg Field CentreSampleInvestment· Trade press (sample)· 22 Aug 2026
- Equinor plans hull inspections on the Aasta Hansteen sparSampleMaintenance· Trade press (sample)· 01 Jul 2026
Contacts at Equinor (4)
- Ida HauglandAsset Integrity Managerida.haugland@equinor.example ✓
- Ida NilsenCategory Manager, Integrity Servicesida.nilsen@equinor.example
- Line LieOperations Managerline.lie@equinor.example
- Line SolbergHead of Maintenance & Modificationsline.solberg@equinor.example ✓
People are fictional. Addresses use the reserved .example domain and cannot receive mail. ✓ marks an address the pipeline verified.
Sources (8)
- [1]Statfjord A late-life plan update adds concrete inspection scope (sample)signal
- [2]Equinor plans the first scheduled integrity campaign on the Johan Castberg FPSO (sample)signal
- [3]Gullfaks A planned shutdown to include expanded inspection scope (sample)signal
- [4]Equinor plans modifications at the Oseberg Field Centre (sample)signal
- [5]Public reference: Norsk Petroleum field facts: Johan Sverdrup ↗enrichment
- [6]Public reference: Norsk Petroleum field facts: Troll ↗enrichment
- [7]Public reference: Norsk Petroleum field facts: Snorre ↗enrichment
- [8]Public reference: Norsk Petroleum field facts: Gullfaks ↗enrichment