Skip to content
Market Intel System
Back to Non-MODU catalog
Installation · Aker BP

Valhall field centre

Bridge-linked steel platforms · Valhall field · North Sea

IN THIS WEEK

About this installation

Valhall field centre is operated by Aker BP on the Valhall field in the North Sea, in 70 m of water. Norsk Petroleum lists production start on the Valhall field in 1982. After 44 years of production the field is in late life, when documented integrity decides how long installations stay in service.

Operator
Aker BP
Type
Bridge-linked steel platforms
Field
Valhall
Public source ↗
Area
North Sea
Water depth
70 m
Public source ↗
Production start
1982
Public source ↗

Field facts: Norsk Petroleum field facts: Valhall

Location

Coordinates: Wikipedia article coordinates.
Why this fits Sørvind
Life-extension integrity studies

Late-life installations need integrity evidence to stay in service. Sørvind's life-extension integrity studies provide it for the operator's application.

More on Aker BP

Recent signals mentioning Valhall field centre, Valhall or Aker BP

Contacts at Aker BP (3)

People are fictional. Addresses use the reserved .example domain and cannot receive mail. ✓ marks an address the pipeline verified.

Sources (8)
  1. [1]Valhall turnaround window set for next year in an Aker BP update (sample)signal
  2. [2]Aker BP extends inspection frame agreement covering Edvard Grieg (sample)signal
  3. [3]Valhall life-extension scope discussed with the regulator (sample)signal
  4. [4]Aker BP plans maintenance work on Ivar Aasen (sample)signal
  5. [5]Public reference: Norsk Petroleum field facts: Valhallenrichment
  6. [6]Public reference: Norsk Petroleum field facts: Ivar Aasenenrichment
  7. [7]Public reference: Norsk Petroleum field facts: Edvard Griegenrichment
  8. [8]Public reference: Norsk Petroleum field facts: Alvheimenrichment