Skip to content
Market Intel System
Back to Non-MODU catalog
Installation · Aker BP

Edvard Grieg

Fixed steel-jacket platform with full process · Edvard Grieg field · North Sea

About this installation

Edvard Grieg is operated by Aker BP on the Edvard Grieg field in the North Sea, in 110 m of water. Norsk Petroleum lists production start on the Edvard Grieg field in 2015. Installations at this stage run established inspection and shutdown cycles.

Operator
Aker BP
Type
Fixed steel-jacket platform with full process
Field
Edvard Grieg
Public source ↗
Area
North Sea
Water depth
110 m
Public source ↗
Production start
2015
Public source ↗

Field facts: Norsk Petroleum field facts: Edvard Grieg

Location

Approximate field location. Approximate field location (no published coordinate in the sources used).
Why this fits Sørvind
Shutdown & turnaround inspection campaigns

Planned shutdowns concentrate inspection work into short windows. Sørvind's shutdown & turnaround inspection campaigns are sized to the operator's turnaround.

More on Aker BP

Recent signals mentioning Edvard Grieg, Edvard Grieg or Aker BP

Contacts at Aker BP (3)

People are fictional. Addresses use the reserved .example domain and cannot receive mail. ✓ marks an address the pipeline verified.

Sources (8)
  1. [1]Valhall turnaround window set for next year in an Aker BP update (sample)signal
  2. [2]Aker BP extends inspection frame agreement covering Edvard Grieg (sample)signal
  3. [3]Valhall life-extension scope discussed with the regulator (sample)signal
  4. [4]Aker BP plans maintenance work on Ivar Aasen (sample)signal
  5. [5]Public reference: Norsk Petroleum field facts: Valhallenrichment
  6. [6]Public reference: Norsk Petroleum field facts: Ivar Aasenenrichment
  7. [7]Public reference: Norsk Petroleum field facts: Edvard Griegenrichment
  8. [8]Public reference: Norsk Petroleum field facts: Alvheimenrichment