Skip to content
Market Intel System
Back to Non-MODU catalog
Installation · OKEA

Brage

Integrated steel-jacket platform · Brage field · North Sea

IN THIS WEEK

About this installation

Brage is operated by OKEA on the Brage field in the North Sea, in 140 m of water. Norsk Petroleum lists production start on the Brage field in 1993. After 33 years of production the field is in late life, when documented integrity decides how long installations stay in service.

Operator
OKEA
Type
Integrated steel-jacket platform
Area
North Sea
Water depth
140 m
Public source ↗
Production start
1993
Public source ↗

Field facts: Norsk Petroleum field facts: Brage

Location

Approximate field location. Approximate field location (no published coordinate in the sources used).
Why this fits Sørvind
Life-extension integrity studies

Late-life installations need integrity evidence to stay in service. Sørvind's life-extension integrity studies provide it for the operator's application.

More on OKEA

Recent signals mentioning Brage, Brage or OKEA

Contacts at OKEA (2)

People are fictional. Addresses use the reserved .example domain and cannot receive mail. ✓ marks an address the pipeline verified.

Sources (6)
  1. [1]OKEA plans a coating inspection campaign on the Brage jacket (sample)signal
  2. [2]Draugen maintenance campaign scope presented at an OKEA supplier day (sample)signal
  3. [3]OKEA prepares life-extension documentation for Draugen (sample)signal
  4. [4]OKEA meets integrity suppliers on Brage priorities (sample)signal
  5. [5]Public reference: Norsk Petroleum field facts: Draugenenrichment
  6. [6]Public reference: Norsk Petroleum field facts: Brageenrichment