Skip to content
Market Intel System
Back to MODU catalog
MODU · Seadrill

West Elara

Jack-up · CJ70 · built 2011

IN THIS WEEK

About this unit

West Elara is a jack-up in the Seadrill fleet, built to the CJ70 design in 2011. Its operator's latest fleet status report places it in Norway. Jack-ups plan leg, spudcan and hull inspections around location moves and their five-yearly class renewals.

Type
Jack-up
Design
CJ70
Built
2011
Status
Active
Public source ↗

Specifications: Seadrill fleet status report, August 2026

Operating area

Norwegian North Sea (southern). The pin marks an approximate operating area, never a rig position.
Why this fits Sørvind
Corrosion & coatings inspection

Jack-ups need leg, spudcan and preload-tank inspections before each location move. Sørvind's corrosion & coatings inspection team covers those scopes.

Intelligence

  • Operating areaPublic source ↗

    Norway, per the operator's August 2026 fleet status report.

Recent signals mentioning West Elara or Seadrill

Contacts at Seadrill (3)

People are fictional. Addresses use the reserved .example domain and cannot receive mail. ✓ marks an address the pipeline verified.

Sources (5)
  1. [1]Seadrill reviews reactivation options for the stacked West Phoenix (sample)signal
  2. [2]West Aquarius layup monitoring raised at a Stavanger supplier day (sample)signal
  3. [3]Seadrill keeps two Norwegian semi-submersibles in layup while contract talks continue (sample)signal
  4. [4]West Elara prepares for its next location move in Norway (sample)signal
  5. [5]Public reference: Seadrill fleet status report, August 2026tech sheet